The helpdesk issue record has tabs for logging materials costs, timesheets and overheads costs.
The materials tab is for adding both materials and plant costs.
NOTES:
The supplier name is selected from your list of contacts - if the name required is not listed, check that the supplier exists in Flow360 and is available in your contacts list.
The new record is added to the list and the totals at the bottom of the list will update.
Add more records as required.
The timesheets tab is for adding timesheet entries for all personnel involved in work on the current issue.
NOTES:
The employer name is auto-filled where possible, based on the person selected being identified as an employee with an employee record.
The new record is added to the list and the totals at the bottom of the list will update.
Add more records as required.
NOTES
The cost of the time (to the client/employer), the chargeout rate and the cost to the client are all calculated from an employee's employment contract record where possible. If there is no employee record with salary and costs information available then defaults will be used (these are set up in the Client admin account preferences).
The overheads tab is for adding oveheads and expenses linked to the current issue record
The new record is added to the list and the totals at the bottom of the list will update.
Add more records as required.
NOTES
The supplier name (where relevant) is selected from your list of contacts - if the name required is not listed, check that the supplier exists in Flow360 and is available in your contacts list.
When you view a helpdesk issue record and there are materials, timesheets and/or overheads records logged, the total costs of these will be displayed in the operating costs field on the details tab.
If there are any linked works records that also have costs information stored in relation to the works order itself, the total of these linked works costs will be included in the total operating costs displayed on the helpdesk issue record.